Complete Plant
-
The Totally Sealed Tube Rubber-Belt Conveyor with the Length of 4,380m
To meet the increasing demand of power supply and the country's economic development needs, the Client is planning to increase the capacity of the present thermal power plants by building 2 new thermal power plants(single 330,000kw) based on the existing 4 thermal power plants(single 330,000kw).
2015-01-22
-
Double-trolley quayside container crane
2015-01-22
-
Semi-submersible loading platform for Canada
2015-01-22
-
The totally sealed tube rubber-belt conveyor with the length of 4,380m
It is the longest of its kind in Asia today. It is the auxiliary project of the 1.5 million ton stainless steel project of Taiyuan Steel (Group) Company in Shanxi Province.
2015-01-22
-
Strategic Grain Reserve in Fujairah, UAE
The project of Strategic Grain Reserve (SGR) in Fujairah, UAE is close to Port of Fujairah (PoF).
2015-01-22
Global office
contact us